Joined
·
2,577 Posts
Well, I got the body work done, the bike is drilled, but not safety wired yet, waiting on new tires for most of it, and I drained the coolant system for the cold front that moved through.
Steering Damper, 1.0lbs/inch fork springs, and vortex clipons are in the mail, and should be ready for install when I return from San Diego next week.
Now, if I could only afford a shock/tires.
Here's some pics of the new paint job.
Steering Damper, 1.0lbs/inch fork springs, and vortex clipons are in the mail, and should be ready for install when I return from San Diego next week.
Now, if I could only afford a shock/tires.
Here's some pics of the new paint job.
Attachments
-
119.9 KB Views: 71